Best Roofing Sheets for Nigerian Weather: Complete Guide


The best roofing sheets for Nigerian weather are 24-gauge Aluzinc (Galvalume) roofing sheets because they provide outstanding resistance to intense heat, heavy rainfall, high humidity, and corrosion. If your property is located within 20 kilometres (12 miles) of Nigeria’s coastline, where salty air accelerates rust, Aluzinc should be your first choice—and realistically, nothing else deserves a place on your shortlist. That is the short answer. The rest of this guide will help you choose the right roofing sheet for your climate and budget, understand the ideal sheet thickness, avoid costly installation mistakes that lead to leaks, and protect yourself from overpriced or misleading sales tactics.

If you are reading this while standing on a construction site with a contractor waiting for your decision, head straight to the roofing sheet prices section. If you are still planning your project and want to make the best long-term investment, start from the beginning. This guide is built on practical experience from real construction projects across Nigeria, supported by market research in Lagos, Abuja, and Port Harcourt, along with honest, experience-based advice that many roofing dealers rarely share because it often works against their profit margins.

Quick Comparison: Roofing Sheets at a Glance

Sheet TypeBest ForLifespan (Southern Nigeria)Noise LevelRelative Cost
Galvanized IronTemporary structures only 5 to 8 years Loud Lowest
Aluzinc/GalvalumeStandard permanent homes anywhere20 to 30 yearsLoud Moderate
Stone CoatedLuxury homes, noise-sensitive rooms25 to 40 yearsQuietHigh
Pre-painted AluminiumCoastal secondary applications20+ yearsLoudHigh
Fiber Cement Schools, factories, noise control 20 to 30 yearsVery quietModerate to high
PVC/Polycarbonate Carports, sheds, skylights only 8 to 15 yearsLoud Low to moderate

Read on for the full detail behind every one of these numbers, because the table alone will not tell you which one is right for your specific building and location.

Why Nigerian Weather Is Uniquely Brutal on Roofing Materials

Nigeria is not one climate. It is about five different weather realities stacked into one country, and the roofing sheet that performs well in Kano will fail within three years in Port Harcourt if you do not understand why.

The tropical sun problem

From March to October across the southern states, the sun does not just shine, it bakes. Roof surface temperatures in Lagos can exceed 75 degrees Celsius on a cloudless afternoon. Cheap paint coatings crack, blister and peel at those temperatures. When the paint goes, the zinc coating underneath starts oxidising and within two rainy seasons you are looking at brown rust stains spreading across your roof.

The UV index in Nigeria sits between 9 and 11 for most of the year, which is classified as extreme by international standards. Premium roofing sheets use PVDF or SMP paint systems precisely because these coatings are engineered to handle UV radiation without degrading. Ordinary polyester paint systems, which are what most budget sheets use, start visibly fading within 18 to 24 months under Nigerian sun.

The rainfall intensity problem

Port Harcourt receives between 2,300 and 2,800 millimetres of rain annually. Lagos gets about 1,700 millimetres. These are not gentle drizzles. Peak season rainfall in the Niger Delta region can dump 80 to 100 millimetres in a single hour, which is an extraordinary volume of water hitting your roof at once.

The issue with cheap sheets is not just that water falls on them. It is the angle and force of tropical downpours that drives water sideways and upward into overlaps and screw holes. Long-span sheets with standing seam profiles or properly engineered interlocking edges handle this. Traditional short sheets with poor overlaps do not.

The coastal corrosion problem

Salt air is invisible, but it attacks unprotected metal constantly. Galvanized iron sheets, which have a thin zinc coating applied through hot-dipping, corrode visibly within four to six years in coastal Nigerian cities. The zinc gets eaten through and bare steel is exposed. Once steel is exposed in salt-laden humid air, rust progresses rapidly.

This is why the composition of Aluzinc (55 percent aluminium, 43.4 percent zinc, 1.6 percent silicon) matters specifically for Nigerian coastal conditions. The aluminium in the coating forms a dense, stable oxide layer that salt air cannot penetrate easily. The zinc provides sacrificial protection at cut edges. Together they extend service life to 20 to 30 years even in coastal locations like Victoria Island, Port Harcourt GRA, Calabar, or Warri.

The humidity and condensation problem

In the South-South zone, relative humidity stays above 85 percent for most of the year. This creates a condensation problem inside roof spaces that most builders completely ignore. When warm humid air rises into your attic at night and contacts cooler metal roofing sheets, moisture condenses on the underside of the sheets. Over years, this moisture drips onto ceiling boards, causes timber purlins to rot, and creates the musty smell many Nigerian homeowners assume is a foundation problem when it is actually a roofing ventilation problem.

The solution involves both sheet selection and installation method, which I will cover in the installation section of this guide.

The regional timing problem

Nigeria’s rainy season does not arrive on the same calendar everywhere, and this affects how you should sequence your roofing purchase and installation.

Southern Nigeria, including Lagos, Port Harcourt and Calabar, experiences heavy and fairly consistent rainfall from March through October, often with two peak periods separated by a shorter dry spell in August known locally as the “August break.”

The Middle Belt, including Abuja, Jos and Makurdi, sees moderate to heavy rainfall roughly from April through October, frequently accompanied by strong winds that arrive ahead of the rain itself.

Northern Nigeria, including Kano and Sokoto, has a shorter rainy season, typically June through September, but the storms that do arrive tend to be sudden and intense rather than gradual.

In practical terms, what this means for you is simple: if you are roofing in the south, aim to have your structure sealed before March. If you are in the Middle Belt or the north, you have a slightly wider window, but the intensity of individual storms means installation quality matters just as much, if not more, since there is less margin for a poorly sealed joint to reveal itself gradually.

The Complete Roofing Sheet Types Available in Nigeria: What They Are, What They Cost, and Who Should Use Them

1. Galvanized Iron Sheets (Traditional GI)

This is the sheet your grandfather used to roof his shop in Onitsha main market. Hot-dipped galvanized iron has a zinc coating applied by passing the steel through molten zinc at around 450 degrees Celsius. The result is a silver-coloured sheet that resists rust reasonably well for its price but cannot survive long-term tropical exposure.

The zinc coating on standard GI is typically between 20 and 30 micrometres thick. Compare that to Aluzinc which has a 55 percent aluminium-zinc-silicon coating that is more uniform and electrochemically superior. GI works acceptably in the far north where humidity is low and rainfall is seasonal and moderate. In the south, it is essentially a temporary solution.

What GI sheets cost:

Lagos (Ikeja and Apapa markets): Between 3,800 and 5,500 naira per square foot depending on brand and gauge.

Abuja (Kugbo and Wuse material markets): Between 3,600 and 5,000 naira per square foot.

Port Harcourt (Rumuola and Rumuokoro markets): Between 4,100 and 5,800 naira per square foot.

Who should use GI sheets: Temporary construction site offices, market sheds, poultry farms, agricultural storage buildings. Never for permanent residential or commercial buildings if you have any better option.

Realistic lifespan in Nigerian conditions: 5 to 8 years in southern states. Up to 12 years in Kano, Sokoto or Maiduguri where air is drier.

2. Aluzinc Roofing Sheets

This is the standard I recommend for the vast majority of Nigerian permanent buildings. Aluzinc is the trade name for steel sheet with a hot-dip coating of 55 percent aluminium, 43.4 percent zinc and 1.6 percent silicon. The aluminium provides the primary corrosion barrier. The zinc protects exposed cut edges. The silicon helps the coating bond metallurgically to the steel substrate.

The result is a sheet that outperforms plain galvanized by a factor of three to six times in corrosion resistance, depending on the environment. It also reflects more solar radiation than GI, which keeps the underside of your roof cooler and reduces the load on your air conditioning.

Aluzinc sheets come pre-painted in dozens of colours using SMP or PVDF paint systems. Good quality painted Aluzinc from manufacturers like Astec, Falcon or Bluescope will hold colour for 15 to 20 years without significant fading under Nigerian sun.

What Aluzinc sheets cost:

Lagos 24 gauge: 7,200 to 8,500 naira per square foot.

Lagos 22 gauge: 8,100 to 9,800 naira per square foot.

Abuja 24 gauge: 6,900 to 8,000 naira per square foot.

Abuja 22 gauge: 7,700 to 9,200 naira per square foot.

Port Harcourt 24 gauge: 7,600 to 9,000 naira per square foot.

Port Harcourt 22 gauge: 8,500 to 10,200 naira per square foot.

Who should use Aluzinc sheets: Permanent residential buildings anywhere in Nigeria. Especially important for coastal cities, the Niger Delta region, and any building within reach of industrial pollution.

Realistic lifespan: 20 to 30 years with minimal maintenance.

3. Galvalume Roofing Sheets

The Galvalume and Aluzinc describe essentially the same product from different manufacturer licensing arrangements. Galvalume was originally developed and patented by Bethlehem Steel in the United States and the name refers to the aluminium-zinc alloy coating on steel. Aluzinc is the name used by European and Asian manufacturers for the same type of product.

In Nigerian markets, dealers sometimes price Galvalume slightly higher than Aluzinc even when the products have nearly identical metallurgical composition and performance. If you are comparing quotes, verify the aluminium percentage in the coating, which should be around 55 percent, rather than just the name.

What Galvalume sheets cost:

Lagos: 6,800 to 10,000 naira per square foot.

Abuja: 6,500 to 9,500 naira per square foot.

Port Harcourt: 7,200 to 10,500 naira per square foot.

Who should use Galvalume: The same situations as Aluzinc. The choice between them often comes down to which brand and grade is available from your local dealer.

4. Stone Coated Roofing Sheets

Stone coated sheets are the option that solves three problems at once: heat, noise and aesthetics. The base is a steel sheet, usually Aluzinc or Galvalume, coated with an acrylic adhesive and then embedded with natural stone granules that are kiln-fired to bond permanently.

The stone surface dramatically reduces the drumming sound during heavy rain, which is one of the major complaints about metal roofing in Nigeria. It also provides a thermal buffer layer that reduces heat transmission into the roof space. And it gives a visual appearance very similar to clay tiles or concrete tiles at significantly lower weight.

Standard stone coated sheets weigh between 6 and 9 kilograms per square metre. Traditional clay tiles weigh 40 to 50 kilograms per square metre. That weight difference means your roof structure can be lighter and less expensive when you use stone coated sheets.

What stone coated sheets cost:

Lagos: 9,000 to 14,000 naira per square foot.

Abuja: 8,500 to 13,500 naira per square foot.

Port Harcourt: 9,500 to 15,000 naira per square foot.

Popular Nigerian brands in this category include Gérard, Decra and local manufacturers. Imported brands come with 30 to 40 year warranties but cost 40 to 60 percent more than local alternatives.

Who should use stone coated sheets: Owners of luxury estate homes, Mediterranean-style architecture, anyone who wants the tile look without the tile weight, buildings where rain noise is genuinely problematic like home offices or nurseries.

Realistic lifespan: 25 to 40 years.

5. Pre-painted Aluminium Sheets

Pure aluminium roofing sheets are a premium option used mainly in coastal areas and modern architectural applications. Aluminium does not rust. Period. It forms aluminium oxide on its surface almost immediately when exposed to air and this oxide layer is what protects it from further corrosion even in salt air environments.

The limitation of aluminium for primary roofing in Nigerian conditions is that it is softer than steel and more prone to denting from large hailstones during harmattan season. It also expands and contracts more dramatically with temperature changes than steel, which means fixing details and screw placement need more careful engineering.

For secondary applications like ceilings, soffits, wall cladding and indoor architectural features, aluminium sheets are excellent. For primary roofing in southern Nigeria where rain is heavy and hail is possible during late harmattan, steel-based sheets are generally more practical.

What aluminium roofing sheets cost: Lagos: 10,500 to 17,000 naira per square foot depending on alloy and thickness.

6. Fiber Cement Roofing Sheets

Fiber cement sheets are made from a cured mixture of cement, cellulose fibres and mineral reinforcement, pressed into corrugated or flat profiles. They are not metal, and that single fact changes their entire performance profile compared to everything else in this guide.

I have specified fiber cement mainly for institutional buildings, schools, and churches where the priority is noise control and fire resistance rather than lightweight speed of installation. The material genuinely excels at both. A heavy downpour on a fiber cement roof produces a dull, muted sound rather than the sharp drumming you get on bare metal, and the material does not support combustion the way some other roofing options do.

The trade-offs are real. Fiber cement sheets weigh considerably more than Aluzinc, which means your roof structure, purlins and trusses need to be engineered for the additional load from the outset, not adjusted afterward. The sheets are also more brittle than metal. A fiber cement sheet that would flex slightly under a dropped tool or a careless footstep during installation can crack outright, and once cracked, that sheet needs full replacement rather than a patch repair.

What fiber cement sheets cost: Lagos and Abuja prices typically run between 4,500 and 7,000 naira per square foot depending on thickness and profile, placing them between Aluzinc and stone coated on the price spectrum.

Who should use fiber cement: Schools, churches, warehouses, and any building where noise control or fire performance genuinely outweighs the convenience of a lightweight metal roof. I would not recommend it for a standard residential duplex unless noise reduction is a specific, stated priority for the household.

Realistic lifespan: 20 to 30 years, shorter if the sheets are not handled and installed with proper care given their brittleness.

7. PVC and Polycarbonate Roofing Sheets

PVC and polycarbonate sheets are lightweight plastic roofing materials that have grown in popularity for specific applications, mainly carports, walkway coverings, poultry sheds, and skylights where natural light transmission matters.

I want to be direct about this one, because I have seen homeowners persuaded to use PVC sheets for primary residential roofing based on price alone, and it has not gone well. PVC becomes brittle under sustained UV exposure faster than any material covered in this guide. In the intense Nigerian sun, a PVC roof that looks fine in year one can show visible degradation, discoloration and micro-cracking by year three or four. It also expands and contracts significantly more than metal with heat, which stresses fixing points over time.

What PVC and polycarbonate sheets cost: Generally 2,500 to 5,000 naira per square foot, making them the cheapest option in this entire guide.

Who should use PVC or polycarbonate: Carports, garden structures, poultry and agricultural sheds, or as a translucent skylight panel inserted within a metal roof to bring daylight into an internal space. I do not recommend it as the primary roofing material for a permanent residential building anywhere in Nigeria, regardless of budget pressure.

Realistic lifespan: 8 to 15 years for primary applications, longer for shaded secondary uses like carports.

Understanding Gauge: The Single Most Important Number on Your Order Form

Gauge is the thickness measurement for metal sheets, and the numbering system is counterintuitive. Lower gauge numbers mean thicker metal. 22 gauge is thicker than 24 gauge, which is thicker than 26 gauge.

Here is what the actual thicknesses look like in millimetres:

26 gauge Aluzinc: 0.40 to 0.45 millimetres total material thickness.

24 gauge Aluzinc: 0.50 to 0.55 millimetres total material thickness.

22 gauge Aluzinc: 0.65 to 0.70 millimetres total material thickness.

That difference of 0.1 to 0.2 millimetres might sound trivial. It is not. Thicker sheets resist denting from hailstones, handle foot traffic during installation without permanent deformation, flex less between purlins which reduces the risk of screw holes elongating over time, and hold colour-coated paint systems better because there is more base metal for the coating to bond to.

The complete gauge guide by building type:

Temporary farm buildings and construction sheds: 26 gauge is acceptable. These will last 5 to 8 years and that may be all you need.

Standard single-storey bungalow in inland states: 24 gauge minimum. This is the entry point for permanent Nigerian residential buildings.

Duplex or two-storey buildings: 22 to 24 gauge. The larger roof spans and greater wind exposure at height require the additional strength.

Coastal buildings within 20 kilometres of sea: 22 gauge minimum regardless of building type. Corrosion is accelerated at the coast and thicker base metal gives your coating more time to protect the steel.

Large span industrial or commercial buildings: 22 gauge minimum. Spans over 3 metres without intermediate purlin support will show oil-canning ripples in 24 gauge under the combination of Nigerian heat expansion and gravity loading.

Buildings intended to carry solar panels: 22 gauge treated purlins or hot-dip galvanized steel purlins, and sheets that have been structurally assessed for the additional load.

The cheat most Nigerian dealers practise with gauge:

When you order 24 gauge sheets, you expect material in the 0.50 to 0.55 millimetre range. Some dealers supply 0.42 millimetre material and describe it loosely as “24 gauge” because there is no strict enforcement of standards in Nigerian roofing markets. Bring a digital vernier caliper to your material purchase. They cost about 3,500 naira at any electrical goods market. Measure 5 to 10 sheets from different positions in the stack. If material is consistently below the specification for the gauge you ordered, do not buy.

The Major Roofing Sheet Brands Available in Nigerian Markets

Astec Roofing Sheets

Astec Manufacturing is one of the most established Nigerian roofing manufacturers, with facilities in Lagos and Kano. Their Aluzinc product line uses imported steel coil and genuine PVDF paint systems. They offer 15 to 20 year paint warranties and their colour range is designed specifically for Nigerian aesthetic preferences, covering charcoal, terracotta, brick red, forest green, tile red and cream.

Astec’s quality control has been consistent over the decade I have been specifying their products. I have revisited buildings I supervised in 2017 and 2018 that used Astec sheets and the paint is still holding well. Their dealer network covers Ikeja, Apapa, Aba, Nnewi and Port Harcourt.

Price premium over generic brands: 10 to 18 percent.

Falcon Roofing Sheets

Falcon is the other major Nigerian manufacturer worth naming. Their long-span sheet programme is particularly strong. Falcon can supply sheets up to 12 metres in a single piece without any joints, which eliminates a major potential leak point on large residential or commercial roofs.

Falcon imports their steel coil from Japan and South Korea, which ensures more consistent coating thickness than manufacturers using third-tier Asian or local steel. Their standing seam profile is well-engineered for the wind conditions in high-density Lagos and Abuja estate developments.

They have showrooms in Lagos, Abuja, Port Harcourt and Kano.

Globe Roofing Sheets

Globe is the budget-friendly domestically manufactured option. Their galvanized product line is adequate for northern Nigerian applications. For coastal and southern applications, their Aluzinc line is workable but the paint system is polyester rather than SMP or PVDF, which means faster colour degradation under intense UV.

If your budget is tight and you are building in Kano, Kaduna, Zaria or Jos, Globe is a reasonable choice. For Port Harcourt, Lagos Island, Calabar or any coastal location, spend the extra to get a better paint system.

BlueScope Lysaght (Australian Origin)

BlueScope products are available through specialty importers in Apapa and some Lagos Island hardware suppliers. This is the same brand used for major commercial and industrial buildings across Asia, Australia and Africa. Their Colorbond and Zincalume products carry 25-year warranties and the paint system is engineered to perform in tropical coastal environments similar to northern Australia.

The price premium is significant: 35 to 55 percent above comparable Nigerian-made Aluzinc. For a standard residential build this premium can add 400,000 to 800,000 naira to your roofing budget. Whether it is justified depends on how long you intend to hold the building and whether you ever plan to sell.

Tata BlueScope (Indian-Nigerian Supply)

Tata Steel through BlueScope has a distribution agreement for the Nigerian market. Their products are similar specification to Australian BlueScope but manufactured in India and priced slightly below the Australian-origin material. Available through selected dealers in Lagos and Abuja.

How to Verify You Are Getting Genuine Roofing Material

This is a section most roofing guides skip entirely, and it is exactly where Nigerian homeowners lose money without realising it until years later, when the “Aluzinc” they paid for starts rusting like plain galvanized iron.

Check for the SON certification mark

The Standards Organisation of Nigeria (SON) certifies building materials sold in Nigerian markets, including roofing sheets. Genuine manufacturers like Astec, Falcon and the major international brands carry SON certification, and this should be visible on the product packaging or delivery documentation, not just claimed verbally by the dealer.

Ask for the mill certificate or coil test certificate

A mill certificate is a document from the steel manufacturer confirming the exact composition of the coating, for example the 55 percent aluminium, 43.4 percent zinc, 1.6 percent silicon ratio that defines genuine Aluzinc. Reputable dealers can produce this on request. If a dealer cannot or will not produce any documentation on the coil origin, treat that as a warning sign, not a formality you can skip.

Physically test the material yourself

I mentioned earlier in this guide that a digital vernier caliper, costing about 3,500 naira, lets you verify gauge thickness on site. Use it. Beyond thickness, examine the coating for uniformity under direct sunlight. Genuine Aluzinc has a distinctive spangled crystalline finish from the aluminium content. Cheaper substitutes finished to imitate this appearance often have a flatter, less distinct pattern, though this visual check should support, not replace, the caliper measurement.

Buy from authorised dealers, not roadside stockists

Manufacturers like Astec and Falcon maintain authorised dealer networks specifically because counterfeit and mislabelled material circulates freely outside those channels. Buying from an authorised dealer does not guarantee zero risk, but it gives you a traceable point of accountability if something goes wrong, which a roadside stockist selling unmarked stock simply cannot offer.

Having seen the consequences of this firsthand, I can tell you that the few thousand naira you might save buying unverified material from an unofficial source is rarely worth the risk of a roof that fails five years earlier than it should have.

2026 Roofing Sheet Prices: A Full Market Survey

These prices are based on personal market surveys conducted in March 2026. Prices in Nigeria move with the naira-dollar exchange rate, so treat these as reference points rather than fixed numbers. Always get at least three written quotes before purchasing.

Lagos (Ikeja Building Materials Market and Apapa)

Sheet TypeGaugePrice Per Square FootApprox Price Per Sheet (6m x 1m)
Galvanized iron263,800 to 4,200 naira22,800 to 25,200 naira
Aluzinc painted247,200 to 8,500 naira43,200 to 51,000 naira
Aluzinc painted228,100 to 9,800 naira48,600 to 58,800 naira
Stone coatedVarious11,500 to 14,000 naira69,000 to 84,000 naira
BlueScope imported2412,000 to 15,500 naira72,000 to 93,000 naira

Abuja (Kugbo Building Materials Market and Nyanya)

Sheet TypeGaugePrice Per Square Foot
Galvanized iron263,600 to 4,000 naira
Aluzinc painted246,900 to 8,000 naira
Aluzinc painted227,700 to 9,200 naira
Stone coatedVarious10,500 to 13,500 naira

Port Harcourt (Rumuola, Rumuokoro and Trans-Amadi Markets)

Sheet TypeGaugePrice Per Square Foot
Galvanized iron264,100 to 5,000 naira
Aluzinc painted247,600 to 9,000 naira
Aluzinc painted228,500 to 10,200 naira
Stone coatedVarious9,500 to 15,000 naira

Port Harcourt prices are typically 5 to 10 percent above Lagos prices due to transportation costs and the additional demand that comes from high construction activity in the oil services sector.

The hidden costs that most roofing quotes leave out:

Screws and EPDM washers: 1,200 to 2,500 naira per bundle of 100. A standard 150 square metre roof will consume 4 to 6 bundles.

Ridge caps: 3,500 to 5,000 naira per running metre. Measure your ridge line length carefully.

Gutters (200mm half-round aluminium): 4,500 to 7,500 naira per metre.

Downpipes (100mm diameter): 2,500 to 4,500 naira per metre.

Roofing underlayment (15lb asphalt felt): 400 to 800 naira per square metre.

Labour: 800 to 1,500 naira per square foot for professional installation including all fastening, flashing and ridge work.

Purlin treatment (anti-rust primer for steel purlins or preservative treatment for timber): 400 to 700 naira per linear metre.

Flashing for penetrations (per opening): 8,000 to 25,000 naira depending on size and complexity.

Always get your roofing contractor to quote a complete installed price per square metre rather than just material. This is the only way to compare quotes fairly.

How to Calculate Exactly How Many Roofing Sheets You Need

This is the calculation that will save you from two common disasters: ordering too few sheets and delaying your project by two weeks waiting for resupply, or ordering too many and wasting 200,000 to 400,000 naira on sheets that rot in storage.

Step 1: Establish your roof footprint area

Measure the external dimensions of your building at ground level. This gives you the plan footprint. For a building that is 12 metres by 9 metres, your plan footprint is 108 square metres.

Step 2: Apply the roof slope factor

Your roof slope (pitch) means the actual surface area of the roof is larger than the plan footprint. The steeper the slope, the larger the difference.

Shallow pitched roof (15 degrees): Multiply footprint by 1.04.

Standard Nigerian pitched roof (25 to 30 degrees): Multiply footprint by 1.15.

Steep roof (40 degrees): Multiply footprint by 1.31.

For a hip roof add a further 5 percent to account for the additional complexity and waste from cutting hip angles.

Example: 108 square metres footprint, standard 25-degree pitch, hip roof. 108 times 1.15 = 124.2 square metres for slope. 124.2 times 1.05 = 130.4 square metres for hip complexity.

Step 3: Add overhang

Standard overhang is 450mm on eaves and 300mm on gable ends. For our example building, the additional area from overhang works out to approximately 14 to 18 square metres.

Total roof surface estimate: 130.4 plus 16 = 146.4 square metres.

Step 4: Determine effective coverage per sheet

A standard 6-metre long sheet with 1.05-metre overall width has an effective coverage width of 1.0 metre after overlap allowance. So one 6-metre sheet covers 6 square metres of roof surface.

Long-span sheets are more efficient because there are fewer transverse overlaps and they can be ordered to the exact rafter length, reducing wastage.

Step 5: Calculate number of sheets

146.4 divided by 6 = 24.4 sheets. Round up to 25 sheets.

Step 6: Add wastage allowance

For standard sheets with site cutting: add 8 to 10 percent. For long-span sheets factory-cut to precise length: add 3 to 5 percent. 25 times 1.09 = 27.25 sheets, rounded to 28 sheets.

Step 7: Order a small contingency for repairs

Order 2 additional sheets from the same batch. Store them flat in a dry covered location. When a sheet gets damaged by a falling branch five years from now, you have an exact colour and thickness match. Colour matching across different production batches is difficult and the difference is visible from the street.

The quick mental check before you order:

Total roof area in square metres, divided by 6 (for 6-metre sheets), multiplied by 1.10 for standard pitched gable roof or 1.15 for hip roof, plus 2 contingency sheets. That gives you a working number that should be within one or two sheets of your actual requirement.

Installation Mistakes That Cost Nigerian Homeowners Serious Money

I have been called to inspect roofs that were leaking after the first full rainy season, and in every case the sheet material was not the problem. The installation was. Premium Aluzinc installed wrongly will fail just as completely as cheap galvanized installed well.

Mistake 1: Purlin spacing that is too wide

Purlins are the horizontal beams that your roofing sheets rest on. The maximum spacing between purlins must match your sheet gauge.

For 26 gauge sheets: 800mm maximum centre-to-centre.

And For 24 gauge sheets: 1,000mm maximum centre-to-centre.

For 22 gauge sheets: 1,200mm maximum centre-to-centre.

When purlin spacing is too wide, sheets flex in the middle between supports under their own weight and under wind load. This flexing creates the rippling appearance known as oil-canning. More seriously, it causes the holes around screws to elongate over time and this creates water entry points that are nearly impossible to seal without removing and repositioning the sheets.

The fix is straightforward at the building stage but expensive after sheets are installed. Specify purlin spacing on your building drawings and verify with a tape measure before sheet installation begins.

Mistake 2: Using the wrong fasteners

The correct fastener for metal roofing in Nigeria is a self-drilling hex-head screw with an EPDM rubber washer bonded to a steel plate. EPDM (ethylene propylene diene monomer) is a rubber compound that maintains its elasticity and seal even after years of heat cycling between 60-degree-Celsius roof surface temperatures by day and cooler nights.

Common mistakes I see on Nigerian sites include using ordinary building nails, using screws without rubber washers, using screws with cheap plastic washers that harden and crack within 18 months, and using galvanized screws with Aluzinc sheets (different metals create galvanic corrosion at the contact point).

The correct screw is a 25mm to 35mm class 4 hex head screw with an integrated EPDM washer. Tighten until the washer just begins to compress and show a slight bulge. If the washer bulges dramatically or the wafer of metal around the screw hole distorts, you have over-tightened and created a future leak.

Mistake 3: Skipping underlayment

I know why contractors skip underlayment in Nigeria. It adds 400 to 800 naira per square metre to the project cost and there is real pressure from clients to reduce spending. But the cost of water damage to a ceiling, to electrical wiring, to the inside of a block wall, and to stored furniture is many multiples of what the underlayment would have cost.

In Port Harcourt where rain is almost constant for six months of the year, a single properly waterproofed roof without underlayment versus one with it makes the difference between a dry house and a house that smells of mildew by its third year.

Use minimum 15-pound asphalt roofing felt or a proprietary synthetic roofing membrane. Lay horizontally from eaves to ridge with 150mm overlaps on horizontal joints. Lap vertical joints a minimum of 300mm. Secure with roofing staples or cap nails at 200mm centres.

Mistake 4: Sheet overlap direction is reversed

This seems like something too basic to get wrong, but I see it on small residential projects more often than I should. Sheets must be installed starting from the lowest point (eaves) and working upward toward the ridge, with each upper sheet lapping over the top edge of the sheet below it.

If sheets are installed top-down with the upper sheet sliding under the lower, every heavy downpour drives water straight between the overlap and into your roof space.

On the horizontal (side-to-side) direction, overlaps should face away from the prevailing wind. In most parts of Nigeria the prevailing wind comes from the southwest during the rainy season. Work from the northeast side of the roof toward the southwest so that side overlaps face away from incoming rain-laden wind.

Mistake 5: Ridge cap installation without sealant

The ridge cap covers the apex of your roof where two opposing roof planes meet. Without proper sealing underneath the ridge cap, this joint is a direct entry point for wind-driven rain.

Apply a continuous bead of butyl tape or neutral-cure silicone sealant under the full length of every ridge cap before fastening. This is a five-minute step that costs perhaps 2,000 to 5,000 naira in materials for a standard residential ridge line. Skipping it can allow water to enter on every storm for the life of the building.

Mistake 6: Ignoring thermal expansion allowance

Metal expands when it heats and contracts when it cools. A 6-metre Aluzinc sheet can expand by 4 to 6mm between a cold harmattan morning at 18 degrees Celsius and a hot dry afternoon at 45 degrees.

When sheets are fastened too rigidly with no allowance for this movement, the screws work loose over time as the metal moves back and forth. Long-span sheets over 4 metres should use a combination of fixed fasteners at the ridge and sliding fasteners at the eaves to allow movement without loosening.

Mistake 7: Poor valley flashing

Valleys are the internal angles where two roof planes meet and channel water toward a downpipe or gutter. They concentrate the highest water volume of any part of the roof. A poorly flashed valley made from the same sheet material as the roof will fail because the water volume creates continuous abrasion and the angle accelerates wear.

Valley flashings should be made from heavier gauge material (20 gauge minimum) and the profile should guide water clearly toward the downpipe. The sheets on each side of the valley should overlap onto the valley flashing by at least 200mm.

How to Spot a Roofing Contractor Who Will Cause You Problems

Everything in the previous section covered installation mistakes. This section focuses on the people making those mistakes because, in my experience, poor workmanship and the wrong contractor usually go hand in hand.

A contractor who cannot clearly explain purlin spacing before starting work may not fully understand the roofing specification. Ask what spacing they recommend for your chosen gauge, and expect a confident, specific answer rather than vague reassurance.

A contractor who supplies fasteners without showing you the product deserves extra scrutiny. Ask to inspect the screws before installation begins. If they are ordinary building screws without EPDM rubber washers, or the washers look like hard plastic instead of quality rubber, pause the work until the correct fasteners are provided.

A contractor who refuses a written scope of work and insists on a verbal agreement is removing your ability to hold them accountable. Always insist on a simple written agreement covering roofing sheet specifications, purlin spacing, fastener type, underlayment, and a payment schedule linked to inspection milestones rather than dates.

A contractor demanding full payment before completing the roof has little incentive to correct defects later. Structure payments so that at least 15–20% is withheld until you have inspected the finished roof during an actual rainfall, not just on a dry day.

One lesson I learned early is that the best contractors are rarely the loudest. The professionals who calmly explain their decisions and welcome questions about spacing, fasteners, flashing, and installation details are usually the ones who know exactly what they are doing. That confidence, combined with transparency, is often a far better indicator of quality than the cheapest quote or the biggest promises.

Roofing Sheet Profiles: Which Profile Works Best in Nigerian Conditions

Not all Aluzinc sheets are the same shape. The profile, meaning the corrugated or ribbed cross-section, affects performance significantly.

Corrugated profile (traditional wave pattern)

This is the most common profile in Nigeria. The regular wave pattern provides reasonable rigidity and looks familiar. It handles water runoff adequately on slopes above 10 degrees. The limitation is that overlaps on corrugated sheets are never perfectly watertight because the corrugation means the two sheets only contact each other at the crest of each wave, leaving small gaps at the valleys.

Trapezoidal and box profile (flat-topped ribs)

Box and trapezoidal profiles are stiffer than corrugated for the same thickness of metal. This allows wider purlin spacing and makes longer unsupported spans possible. Overlaps on trapezoidal profiles are better engineered because the flat sides of the ribs mate more cleanly. Most long-span industrial and commercial roofing in Nigeria uses trapezoidal profiles.

Standing seam profile

Standing seam is the premium option for residential roofing in Nigeria. The sheets interlock along their side edges with a raised seam that sits above the sheet surface. Water cannot enter through the seam because the joint is above the waterline. There are no exposed fasteners on the roof surface at all because clips hidden in the seam hold the sheets down.

Standing seam roofing costs more in materials and requires a more skilled installation team, but it eliminates the two most common failure points in Nigerian metal roofing: exposed screw holes and poor side-lap joints. If you are building a property that you expect to hold for 20 or more years, standing seam is worth the additional investment.

Ventilation: The Roofing Factor Nobody Discusses in Nigeria

Your roofing sheet choice is incomplete without addressing what goes on underneath it. An unventilated roof space in southern Nigeria will reach temperatures of 70 to 80 degrees Celsius by midday during the dry season. At these temperatures, moisture condenses on the underside of metal sheets during the cooler night period. Over years, this condensation rusts purlins, rots timber, causes paint on ceiling boards to bubble, and creates conditions that attract insects including termites into your roof structure.

The solution is cross-ventilation through the roof space.

Ridge vents installed along the full length of the ridge allow hot air to escape continuously as cooler air is drawn in from the eaves. A continuous ridge vent adds 3,500 to 6,000 naira per running metre to your roofing cost and provides roof ventilation that will last the life of the building.

Soffit vents at the eaves draw cool outside air into the roof space to replace the hot air rising out through the ridge vent. Without soffit vents a ridge vent simply creates negative pressure that draws air in through any gap in the roof structure.

Gable louvers on the end walls of buildings with gable roofs provide an additional ventilation path and can be sized to handle the specific volume of a Nigerian attic space.

For a standard 4-bedroom Nigerian bungalow, the rule of thumb is 1 square metre of ventilation opening per 150 square metres of ceiling area, split equally between high (ridge) and low (eaves/soffit) positions.

Addressing the Nigerian Reality: What Changes Your Roofing Budget and Timeline

Dollar rate and material price volatility

Roofing materials in Nigeria are priced in naira but their cost tracks the dollar exchange rate because steel coil is imported or priced against dollar benchmarks. A 15 percent weakening of the naira against the dollar translates to approximately a 12 to 15 percent increase in sheet prices within two to four weeks.

Practical advice: When you have your foundation completed and your block work is at lintel level, get current prices from three dealers, negotiate terms, and pay a 50 percent deposit to lock in price and delivery. Order all roofing materials including sheets, ridge caps, gutters, fasteners and underlayment in a single order. Phased purchasing exposes you to price increases between orders.

The substandard material problem

Not every sheet sold as 24-gauge Aluzinc in Lagos or Port Harcourt is genuinely 24-gauge Aluzinc. Substandard materials range from slightly undersized gauge to non-standard coating ratios to outright galvanized iron being sold as Aluzinc. Protect yourself by buying from the manufacturer’s authorised dealer, requesting a material test certificate or delivery note that shows the coil specification, and physically checking thickness with a vernier caliper on arrival.

On-site cutting and edge protection

When sheets are cut with an angle grinder on site, the heat of cutting destroys the coating at the cut edge and bare steel is exposed. In humid coastal air, visible rust appears at cut edges within weeks. Factory-cut long-span sheets eliminate this problem. Where site cutting is unavoidable, apply cut-edge sealant or zinc-rich cold galvanizing compound to every cut edge before installation.

Flood-prone area considerations

If your building is in a flood-prone area of Port Harcourt, Lagos Mainland or any river floodplain, timber purlins are a risk. Even treated timber absorbs moisture when periodically inundated and rot begins from the inside out. Hot-dip galvanized steel purlins are the correct specification for flood-prone zones. They cost more initially but they will not rot and they will never need replacement under the sheets.

Generator, solar and HVAC penetrations

Every pipe, flue, conduit or duct that passes through your roof is a potential leak point if not properly flashed. Plan all penetrations before sheet installation. Retrospective penetrations cut through installed sheets with an angle grinder and patched with sealant are the single biggest source of roof leaks in Nigerian residential buildings more than five years old.

Use lead or aluminium pre-formed flashing boots for circular penetrations. These are available in standard pipe sizes at good roofing suppliers and provide a reliable, long-lasting seal. Sealant alone around a pipe penetration will last perhaps two to three rainy seasons before cracking and allowing water entry.

Rainwater Harvesting: An Opportunity Most Nigerian Homebuilders Miss

Your roof is not just weather protection. It is potentially a water collection system. The average 200 square metre roof in Port Harcourt can collect between 400,000 and 500,000 litres of rainwater per year during the rainy season. With water scarcity and borehole drilling costs rising, a properly designed roof drainage system connected to underground cisterns can eliminate dependence on PHCN water supply or reduce borehole pump running costs significantly.

The key requirements for rainwater harvesting from metal roofs are:

First-flush diverter: Diverts the first 3 to 5 minutes of rainfall, which washes dust, bird droppings and atmospheric pollutants from the roof surface, away from the storage tank.

Adequate gutter sizing: 200mm half-round gutters handle Nigerian peak rainfall rates without overflowing. 150mm gutters overflow during heavy storms and lose the water you are trying to collect.

Leaf guards on gutters: Prevents debris from entering the downpipe system and blocking it.

Settlement and filtration before storage: Water from the roof requires settling and filtration before use for washing or (with additional treatment) drinking.

For buildings with Aluzinc or stone coated sheets, roof runoff quality is good because these materials do not leach significant contaminants. Traditional GI sheets introduce zinc and iron contaminants that make the water less suitable for use.

Roofing Sheet Colour Selection for Nigerian Conditions

Colour choice is not purely aesthetic. Dark colours like black and charcoal absorb significantly more solar radiation than light colours like cream, light grey or terracotta. On a 40-degree Celsius afternoon, a black Aluzinc roof surface temperature may reach 85 to 90 degrees Celsius while a cream surface of identical material might be 65 to 70 degrees. That 15 to 20 degree difference in roof surface temperature translates directly into attic temperature and ceiling temperature.

For upper-floor comfort in Nigerian residential buildings, especially in the South-South zone where natural ventilation is reduced by humidity, choose lighter colours for your roofing sheets. The practical colours that balance aesthetics and thermal performance for Nigerian homes include:

Cream or off-white: Best thermal performance. Practical for suburban and estate locations. Shows dirt in heavily polluted urban areas.

Light grey or silver: Good thermal performance. Modern aesthetic compatible with contemporary architecture.

Terracotta or brick red: Moderate thermal performance. Popular in estate developments. Compatible with plastered block walls.

Forest green: Moderate thermal performance. Popular in landscaped environments and GRA-style estates.

Charcoal: Poor thermal performance. Best used where aesthetic requirement overrides thermal concern and ceiling insulation will compensate.

Which Roofing Sheet Is Quietest in Heavy Rain? A Straight Comparison

This is one of the most common questions I get from clients who have lived under a bare metal roof before and do not want to repeat the experience, especially for bedrooms, nurseries, or home offices.

Bare Aluzinc and Galvalume sheets are the loudest option in this guide during heavy rainfall. The sound is not the material’s fault exactly, it is physics: rain striking a thin, taut metal surface with an air gap beneath it creates a drum effect, and Nigerian downpours are intense enough to make that drum effect very noticeable, particularly on upper floors directly beneath the roof.

Stone coated sheets are noticeably quieter, because the stone granule coating and its adhesive layer absorb and dampen the impact vibration before it reaches the roof space below. This is the main reason I recommend stone coated for bedrooms directly under the roof line, home offices, or any room where a quiet indoor environment during rainy season genuinely matters to the household.

Fiber cement sheets are the quietest option of all, due to the density and mass of the material itself, which is exactly why institutions prioritising a controlled acoustic environment often choose it despite the added structural weight consideration.

A practical, lower-cost alternative for existing metal roofs is adding a proper roofing underlayment and, where budget allows, a layer of rigid foam insulation directly beneath the sheets. This will not match the acoustic performance of stone coated or fiber cement, but it meaningfully reduces the drumming effect compared to bare sheets with no underlayment at all.

Solar Panel Integration: Planning for the Future While Roofing Today

Electricity in Nigeria is not reliable and solar power adoption is accelerating rapidly. If you are building today and intend to stay in the building for 10 or more years, design your roof for solar panel installation even if you are not ready to install panels immediately.

The structural requirements are:

  1. Purlins designed to carry an additional 20 to 25 kilograms per square metre beyond the roof sheet weight.
  2. Roof pitch between 15 and 25 degrees for optimal solar angle in most of Nigeria.
  3. Ridge orientation that puts the majority of roof area facing south (in Nigeria, south-facing slopes receive the most direct solar radiation throughout the year).
  4. Clear unobstructed roof area. Every water tank, satellite dish, air conditioning unit and vent pipe on your roof reduces the available area for solar panels and creates shading losses.
  5. 22-gauge steel purlins rather than timber for panel fixing points because solar rail attachment screws into timber can pull loose over time under wind load on panels.
  6. Pre-installed conduit runs from roof space to proposed inverter location so wiring can be passed through without cutting through walls later.

Fire Safety and Insurance Considerations

This is a layer of the decision that almost nobody discusses, but it matters more now than it used to, especially with more Nigerian homes adding generators, solar inverter systems, and battery banks close to or beneath the roof structure.

Metal roofing sheets, including Aluzinc, Galvalume and aluminium, do not support combustion and perform well from a fire safety perspective. Fiber cement, discussed earlier in this guide, performs similarly well and is often specified in institutional buildings partly for this reason. Where fire risk genuinely increases is not usually the roofing sheet itself, but what sits directly beneath or against it, timber purlins without any fire-retardant treatment, and poorly ventilated roof spaces where heat from electrical faults has nowhere to dissipate.

If your building includes a generator enclosure, solar inverter room, or battery storage close to the roof structure, ask your electrical contractor and roofing contractor to coordinate directly on ventilation and cable routing through the roof space. I have seen these two trades work in complete isolation from each other on the same building, and the gaps between their work are exactly where problems start.

On the insurance side, some Nigerian insurers offering homeowner or fire insurance policies do ask about roofing material and construction standard as part of risk assessment, particularly for larger or commercial-adjacent properties. If you intend to insure the building, it is worth confirming with your insurer whether your roofing choice and installation standard affects your premium before you finalise your specification, rather than discovering it after the policy is already in place.

Linking It All to Your Building Plan

Every roofing decision connects back to your building design. The roof pitch determines your sheet quantity. The span determines your purlin size. The number of rooms determines your ventilation requirement. The site location determines your corrosion resistance requirement.

If you are still in the design stage, the right place to start is with a properly drawn plan that captures all of this information before you buy a single sheet. Explore the plans library to see how experienced designers handle roofing integration across different building types and climates. Looking at finished drawings gives you a clear picture of the decisions that feed into your final material specification.

For those who want to understand the technical principles behind the decisions in this guide, the plan school section covers roof structure design, material specification and Nigerian building standards in plain language that any serious homebuilder can follow. Understanding the why behind each specification makes you a more informed client who is harder to overcharge.

If you are at the stage where you need professional help to design, specify and document your roofing system correctly, the services page explains how to work with experienced Nigerian built environment professionals who understand local materials, climate, and construction practice.

For Nigerian homebuilders researching beyond this guide, the BlueScope technical resources provide detailed technical documentation on Zincalume and Colorbond products including coating specifications, design guides and performance data.

Putting Your Roofing Budget Together: A Realistic Cost Estimate

Let me walk through a realistic example of what a complete roofing package costs in 2026 for a standard Nigerian 4-bedroom bungalow with a plan footprint of approximately 180 square metres.

Roof surface area (180 sqm footprint, 25-degree pitch, hip roof): approximately 230 square metres.

Aluzinc 24-gauge sheets at average Lagos price of 7,800 naira per square foot: 230 square metres = approximately 2,476 square feet. At 7,800 naira per square foot, the sheet material alone is approximately 19,313,000 naira.

Ridge caps (assume 30 linear metres at 4,500 naira per metre): 135,000 naira.

Gutters and downpipes (80 linear metres at 6,000 naira per metre): 480,000 naira.

Roofing underlayment (230 square metres at 600 naira per sqm): 138,000 naira.

Fasteners and flashings (lump sum): approximately 150,000 to 250,000 naira.

Labour (230 square metres at 1,200 naira per sqft = approx 2,476 sqft): approximately 2,971,000 naira.

Total realistic roofing package for a 4-bedroom bungalow in Lagos, 2026: approximately 23 to 27 million naira depending on brand choice, gauge selection and site-specific requirements.

Upgrading to 22 gauge adds approximately 10 to 15 percent to the sheet cost. Upgrading to stone coated adds 40 to 60 percent to sheet cost. Choosing BlueScope imported material adds 30 to 50 percent to sheet cost.

These numbers move significantly with the dollar exchange rate. Budget a 15 percent contingency for price movement between the time you start planning and the time you actually purchase.

Quick Reference Summary for Nigerian Homebuilders

Best overall roofing sheet for southern Nigeria: Aluzinc 24-gauge minimum, Astec or Falcon brand, SMP or PVDF paint system, light terracotta or cream colour for thermal performance.

And the Best sheet for coastal Lagos, Port Harcourt, Warri, Calabar: Aluzinc or Galvalume 22 gauge, standing seam profile if budget permits, with ridge and soffit ventilation system.

Best sheet for Abuja, Jos, Kaduna, Kano: Aluzinc 24 gauge is excellent. Galvanized 24 gauge is acceptable in low-humidity northern areas if budget is tight.

Best sheet for luxury estate homes: Stone coated Aluzinc for aesthetics and sound reduction, or standing seam Aluzinc for modern minimalist architecture.

Minimum gauge for permanent Nigerian homes: 24 gauge. Do not let any contractor or dealer persuade you that 26 gauge is adequate for a building you intend to keep.

About the Author

Massodih Okon Effiong is a Built Environment Expert and Senior Researcher based in Nigeria. He has a Master’s degree in Urban and Regional Planning, a first degree in Geography and Environmental Management, and professional certificates in Architectural Design, Landscape Design, and GIS. With over 15 years of hands‑on experience in architecture, town planning, GIS, and building economics across Nigerian residential and institutional projects, he understands the real challenges Nigerians face when planning and building homes.

At MassodihPlans, Massodih shares practical Nigerian building guides, modern bungalow and duplex house plans, and built environment resources created specifically for Nigerian homeowners, developers, and property investors. His work is based on real‑life conditions in Nigeria, climate‑responsive design, and cost‑effective planning, aimed at helping everyday Nigerians make smarter, more confident building decisions.

FAQs

Q: What is the best roofing sheet for Nigerian weather?

A: Aluzinc roofing sheets in 24 gauge minimum are the best choice for permanent Nigerian buildings. For coastal cities like Lagos, Port Harcourt and Calabar, 22 gauge Aluzinc or Galvalume is recommended due to the additional corrosion from salt air.

Q: How much do Aluzinc roofing sheets cost in Nigeria in 2026?

A: In Lagos, 24-gauge Aluzinc sheets cost between 7,200 and 8,500 naira per square foot. In Abuja prices range from 6,900 to 8,000 naira per square foot. Port Harcourt prices are typically 5 to 10 percent higher than Lagos due to transport costs.

Q: What is the difference between Aluzinc and Galvalume roofing sheets?

A: Aluzinc and Galvalume describe essentially the same product, a steel sheet hot-dip coated with approximately 55 percent aluminium and 45 percent zinc. Aluzinc is the name used by European and Asian manufacturers and Galvalume is the original American trade name. Performance in Nigerian conditions is virtually identical.

Q: What gauge roofing sheet should I use for a permanent Nigerian home?

A: Use 24 gauge minimum for standard inland residential builds. Use 22 gauge for coastal properties, buildings with spans over 3 metres between purlins, duplexes and any building you plan to carry solar panels on.

Q: How do I calculate how many roofing sheets I need?

A: Multiply your building footprint by the slope factor (1.15 for standard pitch), add overhang area, divide by the coverage per sheet (6 square metres for a 6-metre sheet), then multiply by 1.10 for waste allowance on a standard gable roof or 1.15 for a hip roof.

Q: Why does my Nigerian roof leak even with new roofing sheets?

A: Most leaks in new Nigerian roofs come from installation errors, not sheet quality. Common causes include over-tightened or wrongly specified fasteners, incorrect sheet overlap direction, unflashed penetrations, no sealant under ridge caps, and purlin spacing that is too wide for the sheet gauge.

Q: Are stone coated roofing sheets worth the extra cost in Nigeria?

A: For luxury residential builds, stone coated sheets offer genuine advantages in noise reduction during heavy rain, heat insulation, and tile-like aesthetics at lower structural weight than real tiles. At 9,000 to 14,000 naira per square foot they cost 40 to 60 percent more than standard Aluzinc but last 25 to 40 years with minimal maintenance.

Read the following articles to complete this lesson: